For a garden path, order about 1 cubic yard of decomposed granite per 80–90 sq ft at a 3–4 inch compacted depth (roughly 1.6 tons per yard); a patio base goes deeper at 6 inches, so budget about 1 yard per 55 sq ft. Build it in 2-inch lifts with light water and a plate compactor — never dump the full depth at once, or the bottom never densifies.

DG isn’t gravel — it’s crushed rock dust

Decomposed granite (DG) is pulverized, weathered granite: a mix of fine “fines” and small angular chips that, when damp and compacted, lock into a firm, permeable surface. That’s the opposite of pea gravel or river rock, whose rounded particles never interlock — which is exactly why DG works as a walkable surface and those don’t.

The volume formula is the same one every Yardly calculator uses:

Path: (Length × Width × 3.5 ÷ 12) ÷ 27 = cubic yards compacted × 1.15 for compaction swell × 1.6 = tons Patio: same formula at 6 inches instead of 3.5

Depth goes in inches; the ÷ 12 converts to feet and the ÷ 27 converts cubic feet to cubic yards. The gravel calculator runs this from your exact dimensions and switches between yards and tons.

Depth by use

SurfaceCompacted DG depthWhy
Garden path / walkway3–4 inchesPedestrian loads only; 4-inch minimum over clay or freeze-thaw soils
Patio (furniture)6 inchesConcentrated loads from chairs/tables need a deeper, denser pack
Driveway (rare for DG)8+ inchesDifferent project; DG isn’t ideal for vehicles

A 2-inch crushed-stone or sand base under the DG gives drainage and a level setting bed — figure that as a separate layer when you price the job.

The 2-inch lift rule

A plate compactor only densifies the top few inches per pass. Spread DG in 2-inch lifts, mist each lightly with a hose (damp like sandcastle sand — clumps but doesn’t drip), and compact before adding the next. Dumping the full depth and tamping once leaves the bottom loose, and a loose bottom consolidates later, taking your surface down with it.

Stabilizer: 5–10% by volume on the top layer

Standard DG is fine for most paths. Add a stabilizer only where you’ll set furniture or see heavy traffic:

  • Blend a resin or cement stabilizer at 5–10% by volume into the final lift.
  • Compact, then cure 24–48 hours per product directions.
  • Reapply a scuffed top layer every couple of years in high-use spots.

The stabilizer doesn’t need to penetrate — a half-inch of bonded surface is enough to cut loose aggregate and rutting.

A worked example: a 40×3 ft path + a 12×12 patio

Path (3.5-inch compacted, 1.15 swell):

  • 40 × 3 = 120 sq ft
  • 120 × (3.5 ÷ 12) ÷ 27 = 1.30 cubic yards × 1.15 = 1.5 cubic yards → about 2.4 tons

Patio (6-inch compacted, 1.15 swell):

  • 12 × 12 = 144 sq ft
  • 144 × (6 ÷ 12) ÷ 27 = 2.67 cubic yards × 1.15 = 3.1 cubic yards → about 4.9 tons

Plus a 2-inch crushed-rock base under each: the path base is ~0.9 yard, the patio base ~1.1 yards — run those through the gravel calculator if you’re ordering base and DG together. Finish the DG surface ½–1 inch above adjacent grade so edges don’t wash out, and edge with steel or bender board to contain it.

Keep reading

Advertisement

Frequently asked questions

How much decomposed granite do I need for a path?

Plan on a 3–4 inch compacted depth for pedestrian paths. A 3-foot-wide, 40-foot path at 3.5 inches needs about 1.0 cubic yard compacted (roughly 1.6 tons), plus 15% for compaction swell. Installer guidance from [Dickinson's Garden Center](https://www.dickinsonsgardencenter.com/why-decomposed-granite-tops-budget-hardscape-lists) puts DG at about 1.6 tons per cubic yard and calls for 4 inches on pathways, 6 inches on patios.

How deep should decomposed granite be for a patio?

Go to 6 inches of compacted DG for a patio base, since furniture and foot traffic concentrate loads in a small area. A 12×12 ft patio at 6 inches is about 2.7 cubic yards (around 4.3 tons) before swell — see the depth-by-use table in [George Hardscaping's DG walkway guide](https://georgehardscaping.com/decomposed-granite-walkway-installation/), which pegs pedestrian compacted depth at 3–4 inches and notes deeper for heavy use.

Do I need a stabilizer in decomposed granite?

Only on the top layer, and only where you'll set furniture or get heavy foot traffic. Blend a resin or cement stabilizer at about 5–10% by volume into the final lift, then compact and let it cure 24–48 hours. Without it, DG still makes a firm, permeable path; the stabilizer just reduces loose aggregate and rutting.

What goes under decomposed granite?

Excavate 4–6 inches of topsoil, lay a 2-inch crushed-rock or sand base, compact it, then build the DG in 2-inch lifts on top. A geotextile weed barrier under the base keeps soil fines from migrating up. The [mulch and gravel calculators](/calculators/gravel) cover the base rock if you're pricing both layers.